Willoughby Ave Apartments
Project Portfolio
Engineer to Contract NZS:3910
Paul Belcher; Managing Director of CM – New Zealand Limited, was appointed as Engineer to the Contract NZS:3910 for this construction project, which was a 5 storey, 27 unit building with an underground carpark located in Auckland. This required managing multiple stakeholders and competing priorities as well facing the barriers that came with Covid-19, such as delays and cost fluctuations.
This project also came with a number of complex items, including:
- An underground carpark with a car stacker
- Overhead wires that needed to be undergrounded with a transformer upgrade.
- Public S/S drainage running under the site that had to be operational at all times and diverted.
- Public asbestos water mains that were be worked around in close vicinity to other services.
- Furthermore, these all needed to be carefully planned with traffic management to minimise disruption and cost.
Overview of CM’s Role as Engineer to Contract NZS:3910 (ETC):
- Issued all payment schedules in accordance with the Construction contracts Act.
- Monthly Progress Control Group (PCG) meetings.
- Reviewed cost submissions and/or claims for extension of time and made recommendations for award.
- Issued Practical Completion Certificate once all conditions within the contract had been met.
Paul Belcher
MANAGING DIRECTOR / QUANTITY SURVEYOR
Paul Belcher
MANAGING DIRECTOR / QUANTITY SURVEYOR
Paul has a wealth of experience with over 20+ years in the industry. Paul’s qualifications include: NZ Diploma in Construction Management with Strands in Quantity Surveying, Trade Certificate in Carpentry, National Certificate in Carpentry, Licensed Builder with Carpentry, Site 1 and Site 2 License.